Building plans are the set of drawings which consists of floor plan site plan cross sections elevations electrical plumbing and landscape drawings for the ease of construction at site.
Cross section of 3 commercial building floors.
Steps to drawing a cross section 1.
The slab is constructed on well compacted granular fill crushed stone or marl.
Drawings are the medium of passing the views and concepts of an architect or designer into reality.
The cross section through a composite floor slab using deep decking is shown below.
Mit kendall square soma project noveber 5 2015 building 3 view from third street looking south existing figure e30.
The international code council icc is a non profit organization dedicated to developing model codes and standards used in the design build and compliance process.
The values for dead loads in table 3 2 are for commonly used materials and constructions in light frame residential buildings.
On the floor plan drawing above at the upper and lower left there are two a s surrounded by circular icons with an arrow.
Comprising the roof floor wall and foundation systems including claddings finishes and fixed equipment.
Shading cross hatching or other fill styles and or thicker lines can be used to indicate parts of the structure that have been cut through such as walls roofs and floors.
Floor slab detail.
Building 3 floors 2 5 figure e19.
The mesh reinforcement in the slab is placed in the top with 1 covers.
If you have central heat and or air conditioning with floor vents it is very easy to remove the vents by pulling them straight up.
The scale of a section drawing will depend on the size of the building being drawn and the level of detail that needs to be shown.
Alternative floor slab detail.
Building 3 section 238 main street building 3 e40 parking entry mechanical penthouse figure e29.
To create a cross section first draw a line on your floor plan that cuts through a section of the house for which you need to show cross section detail.
Table 3 3 provides values for common material densities and may be useful in.
Removing a floor hvac vent is the best way to check for total floor thickness.
Contents types of building plan drawings1.
With the vent removed you have a wide clear view of a cross section of your floor.
The ground should have a layer of concrete poured across and there should be a ventilated gap of at least 150mm between the underside of the timbers and the concrete to prevent moisture.
The reinforced concrete floor slab is kept free of the perimeter walls.
Commercial buildings in city centres tend to be relatively tall 6 to 12 storeys is a typical city centre project because of the high cost of land and the confinement of adjacent buildings and utilities.